Jika anda menggunakan HP untuk melihat jadwal silahkan geser ke sebalah kanan.


NO COURSE TITLE JEN-JANG DUR (DAY) COURSE FEE (Rp) JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DES VENUE
SERTIFIKASI OPERATOR SKK KONSTRUKSI BNSP & LPJK JENJANG 1, 2, 3 (TEKNIK SIPIL)
1 Pelaksana Lapangan Pekerjaan Gedung Level 2 2 2 5.750.000 6-7     7-8     7-8     6-7     Bandung
2 Pelaksana Lapangan Pekerjaan Gedung Level 3 3 2 5.950.000 6-7     7-8     7-8     6-7      
3 Juru Gambar Bangunan Gedung Level 2 2 2 5.750.000 6-7       5-6     4-5     3-4   Semarang
4 Juru Gambar Bangunan Gedung Level 3 3 2 5.950.000 6-7       5-6     4-5     3-4    
5 Mandor Konstruksi Level 2 2 2 5.750.000   3-4       2-3     1-2     1-2 Yogyakarta
6 Mandor Konstruksi Level 3 3 2 5.950.000   3-4       2-3     1-2     1-2  
7 Pelaksana Produksi Campuran Aspal Panas 3 2 5.950.000 13-14     14-15     14-15     13-14    
8 Mandor Perkerasan Jalan Level 2 2 2 5.750.000 13-14     14-15     14-15     13-14    
9 Mandor Perkerasan Jalan 3 2 5.950.000 13-14     14-15     14-15     13-14    
10 Pelaksana Lapangan Pekerjaan Jalan Level 2 2 2 5.750.000 13-14       13-14     11-12     10-11  
11 Pelaksana Lapangan Pekerjaan Jalan Level 3 3 2 5.950.000 13-14       13-14     11-12     10-11  
12 Juru Gambar Pekerjaan Jalan dan Jembatan Level 2 2 2 5.750.000   10-11       16-17     8-9     8-9
13 Juru Gambar Pekerjaan Jalan dan Jembatan Level 3 3 2 5.950.000   10-11       16-17     8-9     8-9
14 Pelaksana Pekerjaan Pemeliharaan Jaringan Irigasi Level 3 3 2 5.950.000   10-11     19-20     25-26     17-18  
15 Pelaksana Pekerjaan Pemeliharaan Sungai 3 2 5.950.000   10-11     19-20     25-26     17-18  
16 Operator Muda Survei Terestris 2 2 5.750.000   24-25       23-24     15-16     15-16
17 Operator Madya Survei Terestris 3 2 5.950.000   24-25       23-24     15-16     15-16
18 Operator Grouting 3 2 5.950.000   24-25       23-24     15-16     15-16
SERTIFIKASI OPERATOR SKK KONSTRUKSI BNSP & LPJK JENJANG 1, 2, 3 (TEKNIK MEKANIKAL)
19 Tukang Pasang Pipa 2 2 5.750.000 20-21     21-22     21-22     20-21     Bandung
20 Tukang Plambing 2 2 5.750.000 20-21     21-22     21-22     20-21      
21 Tukang Plambing 3 3 2 5.950.000 20-21     21-22     21-22     20-21     Semarang
22 Mandor Plambing 3 2 5.950.000 20-21     21-22     21-22     20-21      
23 Juru Las Oxyacetylene 2 2 5.750.000   3-4     26-27     4-5     24-25   Yogyakarta
24 Tukang Las Konstruksi Plat dan Pipa Level 2 2 2 5.750.000   3-4     26-27     4-5     24-25    
25 Tukang Las TIG Posisi Bawah Level 1 1 2 5.650.000   3-4     26-27     4-5     24-25  
26 Tukang Las TIG Posisi Bawah Level 2 2 2 5.750.000   3-4     26-27     4-5     24-25  
27 Tukang Las Listrik Level 1 1 2 5.650.000   3-4     26-27     4-5     24-25  
28 Tukang Las Listrik Level 2 1 2 5.650.000   3-4     26-27     4-5     24-25  
29 Mekanik Heating,Ventilation, dan Air Condition (HVAC) 3 2 5.950.000 6-7         2-3     25-26     1-2
30 Operator Pneumatic Tire Roller 2 2 5.750.000 6-7         2-3     25-26     1-2
31 Operator Pneumatic Tire Roller Level 3 3 2 5.950.000 6-7         2-3     25-26     1-2
32 Operator Hydrolic Hammer Breaker 2 2 5.750.000   10-11   7-8     28-29     27-28    
33 Operator Hydrolic Hammer Breaker Level 3 3 2 5.950.000   10-11   7-8     28-29     27-28    
34 Operator Ripper Tractor 2 2 5.750.000 13-14       5-6     11-12     3-4  
35 Operator Ripper Tractor Level 3 3 2  5.950.000 13-14       5-6     11-12     3-4  
36 Operator Bulldozer Level 2 2 2 5.750.000   24-25       16-17     1-2     8-9
37 Operator Bulldozer Level 3 3 2 5.950.000   24-25       16-17     1-2     8-9
38 Operator Motor Grader Level 2 2 2 5.750.000 20-21     14-15     7-8     6-7    
39 Operator Motor Grader Level 3 3 2 5.950.000 20-21     14-15     7-8     6-7    
40 Operator Tandem Roller 2 2 5.750.000   3-4     13-14     25-26     10-11  
41 Operator Tandem Roller Level 3 3 2 5.950.000   3-4     13-14     25-26     10-11  
42 Operator Wheel Loader Level 2 2 2 5.750.000 6-7         23-24     8-9     15-16
43 Operator Wheel Loader Level 3 3 2 5.950.000 6-7         23-24     8-9     15-16
44 Operator Backhoe Loader 2 2 5.750.000   10-11   21-22     14-15     13-14    
45 Operator Backhoe Loader Level 3 3 2 5.950.000   10-11   21-22     14-15     13-14    
46 Operator Pile Drive Hammer 2 2 5.750.000 13-14       19-20     4-5     17-18  
47 Operator Pile Drive Hammer Level 3 3 2 5.950.000 13-14       19-20     4-5     17-18  
48 Operator Dump Truck 2 2 5.750.000   24-25       2-3     15-16     1-2
49 Operator Pompa Beton Level 2 2 2 5.750.000   24-25       2-3     15-16     1-2
50 Operator Pompa Beton 3 2 5.950.000   24-25       2-3     15-16     1-2
51 Operator Bore Pile 2 2 5.750.000 20-21     7-8     21-22     20-21    
52 Operator Bore Pile Level 3 3 2 5.950.000 20-21     7-8     21-22     20-21    
53 Mekanik Hidrolik Alat Berat Yunior 2 2 5.750.000   3-4     26-27     11-12     24-25  
54 Mekanik Hidrolik Alat Berat Senior 3 2 5.950.000   3-4     26-27     11-12     24-25  
55 Operator Mesin Pencampur Aspal 3 2 5.950.000 6-7         16-17     25-26     8-9
56 Operator Mesin Penggelar Aspal 3 2 5.950.000 6-7         16-17     25-26     8-9
57 Operator Vibrator Roller 2 2 5.750.000   10-11   14-15     28-29     27-28    
58 Operator Vibrator Roller Level 3 3 2 5.950.000   10-11   14-15     28-29     27-28    
59 Operator Cold Milling Machine Level 2 2 2 5.750.000 13-14       5-6     25-26     3-4  
60 Operator Cold Milling Machine Level 3 3 2 5.950.000 13-14       5-6     25-26     3-4  
61 Operator Mesin Pemecah Batu 2 2 5.750.000   24-25       23-24     1-2     15-16
62 Operator Mesin Penghampar Beton Semen (Concrete Paver Operator) Level 2 2 2 5.750.000   24-25       23-24     1-2     15-16
63 Operator Mesin Penghampar Beton Semen (Concrete Paver Operator) Level 3 3 2 5.950.000   24-25       23-24     1-2     15-16
64 Mekanik Tower Crane 2 2 5.750.000 20-21     21-22     7-8     6-7    
65 Operator Batching Plant Level 2 2 2 5.750.000 20-21     21-22     7-8     6-7    
66 Operator Batching Plant Level 3 3 2 5.950.000 20-21     21-22     7-8     6-7    
67 Mekanik Asphalt Mixing Plant (Asphalt Mixing Plant Mechanic) 3 2 5.950.000   3-4     13-14     4-5     10-11  
68 Mekanik Engine Tingkat Dasar Level 2 2 2 5.750.000   3-4     13-14     4-5     10-11  
69 Mekanik Engine Tingkat Dasar 3 2 5.950.000   3-4     13-14     4-5     10-11  
70 Operator Scaffolding Level 1 1 2 5.650.000 6-7         2-3     8-9     1-2
71 Operator Scaffolding 2 2 5.750.000 6-7         2-3     8-9     1-2
72 Operator Forklift 2 2 5.750.000 6-7         2-3     8-9     1-2
73 Operator Gondola pada Bangunan Gedung 2 2 5.750.000   10-11     19-20     11-12     17-18  
74 Operator Gondola pada Bangunan Gedung Level 3 3 2 5.950.000   10-11     19-20     11-12     17-18  
75 Operator Launching Gantry 3 2 5.950.000   10-11     19-20     11-12     17-18  

Catatan :

  1. Jadwal pelaksanaan tersebut di atas adalah di Bandung, untuk lokasi Semarang, Yogyakarta, Surabaya, Denpasar dan lokasi-lokasi lainnya silahkan untuk kontak team marketting kami
  2. Harga tersebut di atas hanya biaya pelatihan, belum termasuk biaya akomodasi dan penginapan selama mengikuti pelatihan
  3. Apabila membutuhkan penginapan hotel dengan harga khusus, silahkan menghubungi kami untuk bantuan booking dan mendapatkan corporate rate
  4. Jumlah peserta 4 orang atau lebih untuk Bimbingan Teknis / Pelatihan yang sama dan dalam periode yang sama bisa menentukan Jadwal sendiri
  5. Melayani Pelatihan dan Bimbingan Teknis secara in-house, dimana pelaksanaannya di lokasi masing-masing atau di tempat lain sesuai kesepakatan
  6. Apabila jenis Bimbingan Teknis / Pelatihan tidak tercantum pada daftar di atas, bisa meminta materi khusus dengan pelaksanaan bisa didiskusikan lebih lanjut

PERSYARATAN IJAZAH MASING-MASING LEVEL

  1. JENJANG 1 : Pendidikan Minimal → Pendidikan Dasar O Tahun, Non Pendidikan (Dengan PKB) 2 Tahun
  2. JENJANG 2 : Pendidikan Minimal → SMK 0 Tahun, SMA 3 Tahun, Pendidikan Dasar 4 Tahun
  3. JENJANG 3 : Pendidikan Minimal → D1/SMK Plus 0 Tahun, SMK 3 Tahun, SMA 4 Tahun, Pendidikan Dasar 5 Tahun

Untuk informasi lebih lengkap silahkan menghubungi marketing kami :

  • Telp./WA/Telegram : WA 08122373106
  • E-mail : This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Office  : Jl. Pasir Gede No. 44 Padalarang - Bandung Barat - Provinsi Jawa Barat 40553